Crop Steering Guides Compared
Most of what growers know about crop steering comes from a handful of free guides published by nutrient, substrate, sensor and controller companies. They agree on the structure and disagree on the numbers. Here is what each one covers, where they differ and where to get the official copy.
At a glance
| Guide | Publisher | Best for | Format |
|---|---|---|---|
| Precision Irrigation Strategy | Athena Ag (nutrients) | A full stage-by-stage schedule with substrate EC targets | PDF, metric and imperial, 10 languages |
| Grow Guide: Cannabis Edition | Grodan (stone wool) | Rockwool: shot sizing, start and stop times, emitter flow | PDF, also split into chapters |
| Crop Steering e-book and blog | Growlink (controllers) | Climate and irrigation ranges side by side | PDF e-book, blog, knowledge base |
| Crop steering and dry-back guides | AROYA (sensors) | Understanding dry-back and how it is calculated | Web guides |
| Crop Steering Irrigation application note | Agrowtek (controllers) | The P0 to P3 phases as a control sequence, with formulas | PDF application note |
Athena: Precision Irrigation Strategy
The guide most people mean when they search for an "Athena crop steering guide". Written by Jay Yokiel for Athena Ag, it covers terminology, pot sizing, climate by stage, the P0 to P3 irrigation phases and a stage-by-stage steering plan.
- Substrate: 100% coco in 4 to 10 L pots, or rockwool blocks on slabs. Smaller pots are recommended because they dry back faster.
- Schedule: vegetative in veg; generative in flower weeks 1 to 4 (stretch); vegetative in weeks 5 to 7 (bulk); a mix in weeks 8 to 10 (finish): low substrate EC with a larger dry-back.
- P1: shots of 2 to 6% of substrate volume every 15 to 30 minutes, usually 5 to 9 shots, until field capacity and some runoff.
- P2: maintenance shots after a 3 to 5% dry-back, roughly every 45 minutes to 2 hours. May be skipped if P1 alone hits the target.
- Substrate EC: 3 to 5 in veg, 4 to 10 in stretch, 3.5 to 6 in bulk (mS/cm, pore-water EC).
- Worth knowing: Athena calls the drop after lights-on and before the first shot "additional dry-back". It warns against running high substrate EC after stretch.
Official PDF from Athena support · Support article
Grodan: Grow Guide, Cannabis Edition
The reference for rockwool. Written by the stone wool manufacturer, it focuses on how blocks and slabs hold and release water, and on sizing shots and emitters.
- Shot size: 3 to 6% of total connected stone wool volume per shot. 1 to 2% is "extra small", 3% standard, 4 to 6% large. Count the block and the slab together.
- First shot after lights-on: 0 to 1 h vegetative, 1 to 2 h neutral, 2 to 4 h generative.
- Last shot before lights-off: 0 to 2 h vegetative, 2 to 3 h neutral, 3 to 4 h generative.
- Emitters: 0.3 to 0.5 gallons per hour, with flow measured regularly.
- Worth knowing: the guide treats low-flow, pressure-compensating emitters as essential, and checks that pumps and injectors match their pressure range.
Official PDF (2024 edition) · Crop steering chapter only
Growlink: Crop Steering, A Comprehensive Guide
An e-book by Marcus Baldinger and Kevin Crouch, a commercial cannabis cultivator. It pairs climate and irrigation recommendations for each steering direction and explains the reasoning in plain language.
- Vegetative: 78 to 85 °F, 70 to 85% RH, VPD 0.6 to 1.1 kPa, shots of 1 to 3% of substrate volume, dry-back of 1 to 10%, substrate EC of 2 to 4.
- Generative: 65 to 78 °F, 45 to 70% RH, VPD 1.0 to 1.5 kPa, shots of 3 to 6%, dry-back of 15 to 30%, substrate EC of 5 to 12.
- Worth knowing: the dry-back figures do not say whether they are VWC points or a percentage of peak. Check the difference before using them.
This is version 1.4 of the e-book, created in December 2021. It may be out of date: Growlink's current recommendations and products may differ. Check Growlink's site for their latest guidance.
Growlink Crop Steering e-book, V1.4 (PDF, 77 pages, 15 MB) · Growlink: the 4 phases of irrigation · Growlink crop steering guide (knowledge base)
AROYA: crop steering and dry-back guides
Web guides from a substrate sensor company. They are the clearest explanation of dry-back itself, including the fact that growers calculate it in more than one way.
- Explains both absolute dry-back (VWC points) and dry-back relative to field capacity.
- Gives a general root-zone temperature range of 18 to 24 °C.
- Covers the full set of steering levers, not just irrigation.
Crop steering: the ultimate guide · Mastering dry backs
Agrowtek: Crop Steering Irrigation application note
A technical note from a controller maker. It treats the steering day as a control sequence and gives the formulas behind it: VWC, runoff percentage, final dry-back target and shot time.
- Vegetative: P1 shots of 3% with 1 point dry-back between them; P2 target 55 to 70% VWC; overnight dry-back of 10 to 15% of field capacity.
- Generative: P1 shots of 4 to 8%; P2 shots and dry-backs of 4 to 8%; overnight dry-back of 20 to 30% of field capacity.
- Worth knowing: recommends ending the final weeks generatively for density. Athena's schedule does the opposite with EC, which shows how unsettled the finish still is.
Official application note page
Where the guides disagree
| Topic | What varies | What to do |
|---|---|---|
| Dry-back | VWC points, percent of peak or percent of field capacity; some guides do not say | Convert before comparing. Dry-back explained |
| Substrate EC | Pore-water, bulk or runoff EC, all called "EC" | Check which one, and compare only like with like |
| Finish | Generative with high EC, or low EC with a large dry-back | Run it as a trial with a control zone |
| Shot size | 1 to 8% depending on guide and substrate | Calculate from your measured emitter flow. How |
| Start and stop times | Up to 4 h after lights-on and before lights-off for generative | Move in 30 to 60 minute steps and watch three nights |
Each guide was written for its publisher's products and conditions. None of them is wrong, and none of them was written for your room. Our crop steering chart puts the common ground on one page.